A patio is mostly what you cannot see. The sub-base underneath and the fall across the surface decide whether it stays flat and dry or rocks, sinks and pushes water at the house. Both are decided before a single slab is laid.
Size it before anything else
Patios are routinely built too small. A table with four chairs needs about three metres by three metres once the chairs are pulled out and someone can walk behind them. Six chairs wants three and a half by three and a half.
Mark it out with canes and string, put the actual furniture on the marked area, and sit in it. Doing that for twenty minutes prevents the most expensive mistake in garden construction.
Think about where the sun falls at the time you will use it. A patio in shade from six in the evening is in the wrong place, however conveniently it sits by the back door.
The damp proof course rule
The finished paving must sit at least 150mm below the damp proof course. The DPC is visible as a thicker mortar line a couple of brick courses up the wall. Paving above it, or bridging it, lets water track into the house wall, and the resulting damp is expensive and slow to fix.
If the ground level does not allow that, you need a drainage channel and a gap between the paving and the wall rather than raising the patio. This constraint frequently determines the whole design, so establish it at the survey stage.
Excavation
Dig out to allow for the full build-up: about 100 to 150mm of compacted sub-base, 30 to 50mm of mortar bed, plus the thickness of the slab. For typical slabs that means excavating around 200 to 250mm below the finished level.
Go deeper for a driveway or anywhere a vehicle will run. Remove all topsoil and any soft material, and firm the base.
The sub-base
Use MOT Type 1 hardcore, laid in two layers and compacted with a plate compactor, which is worth hiring. A hand tamper is adequate only for very small areas.
Compacting properly is the difference between a patio that stays flat and one that develops dips within two years. Each layer should be compacted before the next goes on.
The fall
A patio must slope away from the house so water runs off rather than pooling against the wall or freezing into a hazard.
The standard is a fall of about 1 in 80, which is roughly 12mm over every metre. Over a three-metre patio that is around 36mm of drop, which is barely visible and entirely sufficient.
Set up string lines at the finished levels before laying and work to them, checking constantly with a spirit level and a tape rather than by eye. Water finds a level error that the eye cannot.
Think about where the water goes once it leaves the patio. Directing it onto a lawn or a border is fine; directing it at a neighbour's boundary or into a soakaway that cannot cope is not.
Laying the slabs
Lay on a full mortar bed rather than on five dabs. The dab method leaves voids under the slab, which fill with water, freeze, and crack the slab.
Use a mortar bed of about 30 to 40mm, and for natural stone prime the underside of each slab with a slurry primer, since sandstone otherwise fails to bond and slabs lift.
Work from a fixed edge, tap each slab down with a rubber mallet, and check level and fall as you go. Leave consistent joints of eight to twelve millimetres rather than butting slabs together.
Pointing
Leave the slabs to set for a day or two before filling the joints. Options are a traditional mortar mix pressed in and struck, or a proprietary jointing compound brushed in and watered, which is quicker and far more forgiving.
Whichever you use, follow the temperature restrictions on the product. Pointing in frost or in blazing sun both cause failure.
Planning permission
Paving a garden is generally permitted development, but there are restrictions on paving front gardens with impermeable surfaces above a certain area without drainage provision. Check with the local authority before paving a front garden, and consider permeable options anyway.