Back to Design

Fixing Decking Boards

Fixing Decking Boards
Gardening Guides Editorial 31 July 2026

The frame determines whether a deck lasts. The board fixing determines whether it looks right and whether water drains away rather than sitting on it.

Gaps between boards

Boards are laid with a gap between them, and the gap does two jobs: it lets water drain through, and it allows for the timber swelling and shrinking with moisture.

Five to eight millimetres is the usual figure for timber, though it depends on the moisture content of the boards when laid.

Boards delivered wet will shrink, so lay them closer. Boards that are dry will swell, so lay them wider.

Composite is different and the manufacturer's figures must be followed exactly, since composite expands and contracts more than timber with temperature. Gaps at the ends of boards matter as much as those along their length.

Use spacers or offcuts of a consistent thickness rather than judging by eye.

Too narrow and water sits and debris clogs the gaps. Too wide and the deck looks sparse and heels catch.

Screws or hidden fixings

Screws are the traditional method: two per board at each joist, set in from the edges, driven flush or very slightly below the surface.

Use decking screws rather than ordinary woodscrews, with a countersinking head and a thread designed to pull the board down.

Stainless steel or properly rated coated screws are essential, since the copper in treated timber corrodes ordinary steel rapidly, staining the boards and eventually failing.

Hidden fixings clip into a groove in the side of the board and give a clean surface with no visible screw heads.

They cost more, take longer, set the gap automatically, and make individual board replacement more awkward.

Most composite systems are designed for hidden fixings.

Pre-drilling

Pre-drill near the ends of boards, and always on hardwood, which splits readily.

Countersink so screw heads sit flush or slightly below, since a proud screw head is a trip and a snag.

Keep screws at least fifteen to twenty millimetres in from the board edge and from the end.

Board direction

Boards running away from the house make a deck look longer; running across it make it look wider.

Diagonal laying looks striking, generates considerably more waste and cutting, and requires closer joist centres because the effective span increases.

Avoid a pattern that puts many board ends in one line, which looks weak. Stagger the joints across the deck, and always support a board end on a joist rather than leaving it unsupported.

Where two boards meet end to end, double the joist beneath or fit a noggin so each board end has bearing.

Which way up

Grooved boards are widely sold as anti-slip, and the grooves trap dirt and water and arguably make the surface worse.

Many decking specialists now recommend laying grooved boards smooth side up.

Whichever you choose, the honest answer to slip resistance is regular cleaning rather than the profile of the board.

Setting out

Check the frame is square by measuring diagonals before starting.

Lay the first board absolutely straight and parallel to whatever it should relate to, usually the house, since every subsequent board follows it.

Measure the total width and calculate the board and gap layout in advance, so you do not finish with a sliver of a board at the far edge.

Adjust the gaps very slightly across the deck to make the last board a full width.

Cut ends and edges

Treat every cut end with end-grain preservative before fixing, since cutting exposes untreated timber and that is where rot begins.

Finish the deck edges with a fascia board or a trim, which tidies the board ends and protects the frame.

Working safely

Wear eye protection when cutting, and use a dust mask, since treated timber dust is an irritant.

Do not burn treated timber offcuts, which releases harmful substances into the air. Dispose of them through the household waste recycling centre instead.

Acclimatising boards

Timber boards delivered from a merchant may be wetter or drier than they will be in service.

Stack them flat and spaced, under cover but in the open air, for a week or two before laying, so the moisture content settles closer to where it will end up.

This reduces the amount of shrinking, swelling and cupping after the deck is finished.