Almost every deck that fails does so from underneath. The boards are visible and replaceable; the frame is neither, and getting it right is what determines whether the deck lasts ten years or twenty-five.
Timber specification
Use timber pressure treated to a level suitable for the situation. Anything in contact with the ground, or permanently damp, needs a higher treatment level than boards above it.
Check what the merchant is supplying rather than assuming, since ordinary treated timber used in ground contact rots within a few years.
Treat every cut end with an end-grain preservative before fixing. Cutting exposes untreated timber, and the cut end is where rot starts.
Use stainless steel or properly rated coated fixings, since treated timber corrodes ordinary steel.
Keep timber off the ground
The single most important principle.
Support the frame on concrete pads, piers or purpose-made post supports so no timber sits directly on soil.
Where posts are set into the ground, use ground-contact rated timber and consider metal post anchors set into concrete, which keep the timber above ground entirely.
Allow a clear gap between the ground and the underside of the frame.
Ventilation
Air must circulate beneath a deck. Trapped damp air is what rots the frame from below while the top still looks sound.
Allow at least a hundred millimetres of clear space beneath the joists, and more where you can.
Do not enclose the sides completely. Where a skirt is fitted for appearance, use slatted or perforated material rather than solid boarding.
Keep the space beneath clear of leaves and debris, which hold moisture, and make sure it can be reached to clean out.
Lay a permeable membrane over the ground beneath and cover it with gravel to suppress weeds while allowing drainage.
Joist spacing
Joists at four hundred millimetre centres is the usual specification for standard decking boards.
Reduce to three hundred centres where boards are laid diagonally, since the effective span between supports increases, and for thinner boards.
Composite boards frequently require closer centres than timber, sometimes three hundred or less. Check the manufacturer's instructions, since composite laid on timber spacing sags between joists.
Joist size depends on the span between supports. Longer spans need deeper joists, and the tables in the manufacturer's or supplier's guidance should be followed rather than guessed.
Falls and drainage
A slight fall of around one in eighty away from the building helps water run off, though a properly gapped deck drains between the boards.
Keep the deck surface at least a hundred and fifty millimetres below the damp-proof course of a house.
Do not fix a deck frame directly against a house wall in a way that bridges the damp course or traps moisture against the brickwork.
Bracing and fixings
Fix joists to the frame with joist hangers rather than skew nails, which gives a far stronger connection.
Brace a raised deck diagonally to prevent racking, which is sideways movement under load.
Bolt rather than nail structural connections on anything raised.
Getting the levels right
Set out and level the frame carefully before any boards go on, checking diagonals to ensure it is square.
Errors in the frame appear in every board and cannot be corrected afterwards.
Under-deck conditions
The space beneath a deck is dark, sheltered and undisturbed, which makes it attractive to rats.
Avoid creating a completely enclosed void, keep food and bird seed away, and make sure the space can be inspected.
When to get advice
Raised decks, decks attached to a building, and anything more than about three hundred millimetres above ground all involve structural and regulatory considerations, and are worth designing properly rather than improvising.
Common failures
Timber in contact with soil, which rots within a few years whatever is on top of it.
No ventilation beneath, so the frame rots from below while the surface still looks sound.
Untreated cut ends, which is where rot starts on an otherwise well-built deck.
Ordinary steel fixings, which corrode in treated timber and stain the boards.
Joists spaced too widely for the boards being used, which produces a deck that flexes underfoot and sags between supports.
All five are decided before a single board goes down, and none can be corrected afterwards without taking the deck apart.